Yeah for sure, like if you see value in 3 phases for things outside your EV (such as solar, or needing a welder ect..) then yeah its sweet.norbs wrote: ↑Thu Jan 13, 2022 2:23 pm I was basing my comments on the fact Smith said he was after a fast charger. If you dont think he does, then 3 phase goes out the window.
Something else for NSW people to think about, if you have single phase, and a large solar system, you can only export 5kW. If you have 3 phase, up to 15kW.
But most people "think" they need a ultra fast charger, but realistically they never do, and I guess my story was just to be cautious about overcapitalising, which is the exact same story for solar